About this deal
Whether the places that the scaffold abuts public areas are common areas or under controlled private ownership. ALL Ladders Extension Ladders Combination Ladders Telescopic Ladders Roof Ladders Glassfibre Ladders Single Ladders Whilst signage is appropriate, this is a low level of control and unlikely in itself to deter children.
A ladder guard that is not wide enough for the ladder it is fitted to. Small feet can still climb the exposed rungs and the guard could slide even further to one side. Ladderguards – to fit wider ladders, for example, ladders with rung lengths of 500mm+, bespoke length Ladderguards – to suit Carrying slots, if provided, should be vertical (along the long axis of the guard) not horizontal where they could be used as a foothold. The Work at Height Regulations 2005 – Regulation 8 and Schedule 3 Part 2 Clause 11, Schedule 6 Clause 5 References
Simply hook the Ladder Guard over a rung on the ladder, with the bottom of the Ladder Guard as low as possible on the ladder, but without touching the ground (PICTURE 1).
They must not be able to tilt or pull away from the ladder – rungs should not be exposed at the front or be climbable from the rear.Where fixed ladders are fitted to the outside of buildings ladder guards offer Facility Managers the ability to The sign acting as a reminder to all personnel that the ladder should not be accessed without appropriate authorisation. They must make each rung unusable – ie no more than 50mm of rung should be exposed when the guard is pushed as far sideways as possible.
and may be more appropriate inside a building where access to the ladder is generally restricted to employees. Other standard variants of our Ladderguard include our ‘ships ladder’ guard which is designed for slightly angled ladders with Number of access points onto the scaffold – including the number of levels within an occupied or accessible building that lead onto the scaffold. The fencing should be installed as the scaffold is built, lift by lift, which means either writing this into the scaffold contract or having a separate contractor working with the scaffolding contractor so that there is no lag between the scaffold going up and fencing being fitted.ALL Scaffolds & Towers Domestic Towers STEEL Scaffold Towers ALLOY Scaffold Towers Industrial Towers Podium Steps & Low-Level Scaffs Chimney & Roof Scaffolds Garden Scaffolds Stairwell Scaffolds Zone 1 GLASSFIBRE Safety Towers